we are specialists
RENEWABLE
energies
STORAGE PLANT IN CENINRENEWABLES BATTERIES
Renewables Energies.
Project in EPC mode / Principal Contractor of Tesla, where in addition to management and subcontracting, Meins included the following scope:
Supply, Transport and Commissioning of 2 prefabricated concrete transformation centers, composed of cluster frame, transformer and medium voltage cells, SSAA transformer and ancillary services, as well as 8 prefabricated slabs for battery and inverter support and 2 slabs for medium voltage wiring. Download, Install and Connect “Powerpack” from Tesla.
Supply and installation of wiring connection between inverters and cluster panel, land network and perimeter fence.
Supply and installation of medium voltage connection wiring between transformation centers.
Supply and installation of medium voltage cell 36 kV 20kA/1s, installed at the Connection Point.
Date: 2018
Client: Tesla
Location: Bridgend, Wales
Power: 4.4 MW
HEADQUARTERS EUROPE:
C/ Hernán Cortés, 2-4 . Parque Industrial Los Villares
Villares de la Reina, 37184 – Salamanca
Telf. +34 923 204 309
Fax. +34 923 204 303